The project didn't appear all at once. It was built idea after idea, each answering a question raised by the one before: what about noise? what about safety? what about cost? what about winter? This page retraces that journey.

May 17, 2026

The concept. The idea is born: a network of bike tunnels roughly 100 km long, built at low cost thanks to the tunnel-boring technology developed by The Boring Company (Elon Musk).The Network →

May 19, 2026

The shuttles. The idea of truck and boat shuttles to connect the shores and cross natural obstacles.Shuttles →

May 21, 2026

Safety. First thoughts on the safety of the network and on the presence of patrollers.Safety →

May 22, 2026

Acoustics. The idea of damping the echo in the tunnels using textured concrete and acoustic panels fixed to the upper dome.Acoustics →

Comparing transport modes. Design of a weighting system to objectively compare the different modes of transport.Comparison →

The dimensions. Checking the tunnel's real dimensions.Dimensions →

The 3rd dimension. Using the 3D geometry of the tunnels to allow circulation without a single stop.The 3D advantage →

May 23, 2026

Phosphorescence. Using phosphorescence to keep the tunnels lit in the event of a major power outage.Phosphorescence →

Market study (1). A first market study, inspired by the cases of Montréal and Copenhagen.Study →

May 24, 2026

Simulating nature. The idea of recreating natural settings inside the tunnels to improve the user experience.Simulating nature →

May 25, 2026

Permitted vehicles. Defining the types of vehicles allowed to travel through the network.How It Works →

May 26, 2026

How it works. Drafting the tunnel's operating rules.How It Works →

May 27, 2026

Construction cost. A first genuine preliminary estimate of the construction cost.Construction →

May 28, 2026

Operating cost. A first genuine preliminary estimate of the operating cost.Operation →

June 1, 2026

Yield. Adopting the “yield” principle, as on a highway, to smooth traffic at the tunnel crossings.How It Works →

June 3, 2026

The route. Designing the route according to population density.The Network →

June 6, 2026

Underground stations. The idea of building underground stations.Stations →

June 11, 2026

Surface stations. The idea of surface entrance stations, a far less costly solution.Stations →

June 13, 2026

Market study (2). A new market study, this time based on the city of Oulu, Finland.Study →

June 16, 2026

Geothermal energy. Using geothermal energy to heat the stations.Geothermal →

June 19, 2026

The walkway. The idea of routing the pedestrian walkway under the bridge, to shield users from the rain and to remove the two other walkways.Shuttles →

June 24, 2026

Cables and fiber optics. The idea of running electrical cables and fiber-optic lines beneath the bike path.Other uses →

June 26, 2026

Drone delivery. The idea of running delivery drones beneath the bike path.Drone delivery →

A living project. This timeline keeps growing. Do you have an idea, a question or expertise to share? Write to us — the project moves forward thanks to everyone's contributions.